Azusa P-1250

General information

Waterway  San Gabriel River
Current status   Active license 
Type of facility Conventional Hydro
Type of permit FERC License

FERC information

FERC docket # P-1250
FERC project name Azusa
Permit issued 12/31/88
Permit expiration 12/27/18

Ownership and operation

Owner City of Pasadena
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1949
Transmission or distribution system owner Southern California Edison Co

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 3.0 MW
Average annual net hydropower generation 1,785.4 MWH