ME
Bar Mills P-2194
General information | |
Waterway |
Saco River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2194 |
FERC project name | Bar Mills |
Permit issued | 8/21/08 |
Permit expiration | 7/27/48 |
Ownership and operation | |
Owner | Brookfield White Pine Hydro, LLC. |
Owner type | Wholesale Power Marketer |
Year first online (conventional hydro) | 1956 |
Transmission or distribution system owner | Central Maine Power Co |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 4.0 MW |
Average annual net hydropower generation | 15,989.4 MWH |
The Bar Mills Project consists of a 364-foot-long, 7-foot-high concrete gravity dam that impounds a 263-acre, 5.3-mile-long reservoir. The powerhouse contains two 2.0-MW generating units that discharge water into a 200-foot-long tailrace.
Project power is transmitted through a 30-foot-long, 34/2.4 kilovolt (kV) transmission line connected to the regional grid.
Milestones
New License Issued | 08-26-2008 |
Is there something you’d like to add or correct? Please let us know.
Related resources
News and updates
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition