KY
Barkley
General information | |
Waterway |
Cumberland River |
Current status | Active  |
Type of facility | Conventional Hydro |
Type of permit | US Army Corps of Engineers |
Ownership and operation | |
Owner | USCE-Nashville District |
Owner type | USACE |
Year first online (conventional hydro) | 1966 |
Transmission or distribution system owner | Tennessee Valley Authority |
Power and generating capacity | |
Number of units | 4 |
Total capacity from hydraulic turbine-generator units within each plant | 130.0 mW |
Average annual net hydropower generation | 665,206.9 mWH |
Is there something you’d like to add or correct? Please let us know.
Newsandupdates
From Alabama Rivers Alliance1/26/2023
From California Trout1/24/2023
Introducing CalTrout’s Lost Coast Project Manager & Update on Eel River Dams