VT

Bennington Water Treatment Hydro Plant P-13269

General information

Waterway  Pipeline
Current status  Active 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Exemption

FERC information

FERC docket # P-13269
Permit issued 1/4/2009

Ownership and operation

Owner Town of Bennington, Vermont
Owner type Publicly Owned Utility

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 0.0 mW
Average annual net hydropower generation 140.0 mWH

From our Resource Library

License summaries, Pacific

Pit 3, 4, 5 Project, Pit River, California

See all resources