Benton Falls P-5073

General information

Waterway  Sebasticook River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-5073
FERC project name Benton Falls
Permit issued 3/3/84
Permit expiration 2/24/34

Ownership and operation

Owner Essex Hydro Associates LLC
Owner type Private Non-utility
Year first online (conventional hydro) 1987
Transmission or distribution system owner Central Maine Power Co

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 4.2 MW
Average annual net hydropower generation 17,113.5 MWH