CA
Big Creek 4 P-2017
General information | |
| Waterway |
San Joaquin River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Peaking |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-2017 |
| FERC project name | Big Creek No 4 |
| Permit issued | 11/29/03 |
| Permit expiration | 11/26/39 |
Ownership and operation | |
| Owner | Southern California Edison Co |
| Owner type | Investor-Owned Utility |
| Year first online (conventional hydro) | 1951 |
| Transmission or distribution system owner | Southern California Edison Co |
Power and generating capacity | |
| Number of units | 2 |
| Total capacity from hydraulic turbine-generator units within each plant | 100.0 MW |
| Average annual net hydropower generation | 358,285.7 MWH |
Is there something you’d like to add or correct? Please let us know.
Related posts
- From American Whitewater 04/29/21
Annual Rec Flows Start this Spring Horseshoe Bend San Joaquin River (CA)
News and updates
From California Sportfishing Protection Alliance11/1/2025
Measuring Flow to Support New Interim Flow Requirements in the Shasta River
From California Sportfishing Protection Alliance11/1/2025

