WA
Big Sheep Creek P-5118
General information | |
Waterway | Big Sheep Creek |
Current status | Active  |
Type of facility | Conventional Hydro |
Type of permit | FERC Exemption |
FERC information | |
FERC docket # | P-5118 |
FERC project name | Big Sheep Creek |
Permit issued | 8/6/1983 |
Ownership and operation | |
Owner | Sheep Creek Hydro Inc |
Owner type | Private Non-utility |
Year first online (conventional hydro) | 1986 |
Transmission or distribution system owner | Avista Corp |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 1.6 mW |
Average annual net hydropower generation | 7,388.0 mWH |
News and updates
From Trout Unlimited2/26/2021
From California Trout2/26/2021