Biron P-2192

General information

Waterway  Wisconsin River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-2192
FERC project name Biron
Permit issued 7/25/03
Permit expiration 6/26/33

Ownership and operation

Owner Consolidated Water Power Co
Owner type Investor-Owned Utility
Year first online (conventional hydro) 1896
Transmission or distribution system owner Consolidated Water Power Co

Power and generating capacity

Number of units 8
Total capacity from hydraulic turbine-generator units within each plant 5.6 MW
Average annual net hydropower generation 29,724.3 MWH