NY
Black River Hydro Associates P-5571
General information | |
Waterway |
Black River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Type of permit | FERC Exemption |
FERC information | |
FERC docket # | P-5571 |
FERC project name | Denley |
Permit issued | 3/12/83 |
Ownership and operation | |
Owner | CHI Energy Inc |
Owner type | Private Non-utility |
Year first online (conventional hydro) | 1984 |
Transmission or distribution system owner | Niagara Mohawk Power Corp. |
Power and generating capacity | |
Number of units | 1 |
Total capacity from hydraulic turbine-generator units within each plant | 5.7 MW |
Average annual net hydropower generation | 15,639.9 MWH |
Is there something you’d like to add or correct? Please let us know.
Related resources
News and updates
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition
From American Rivers9/9/2024