NY

Black River Hydro Associates P-6447

General information

Waterway  Black River
Current status   Active license 
Type of facility Conventional Hydro
Type of permit FERC Exemption

FERC information

FERC docket # P-6447
FERC project name Port Leyden (Lower)
Permit issued 9/26/82

Ownership and operation

Owner CHI Energy Inc
Owner type Private Non-utility
Year first online (conventional hydro) 1984

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 2.2 MW
Average annual net hydropower generation 5,358.8 MWH

Is there something you’d like to add or correct? Please let us know.