AK

Blind Slough P-201

General information

Waterway  Crystal Creek
 Blind River
Current status   Active license 
Type of facility Conventional Hydro, Small Hydropower ( ≤ 10 MW)
Mode of hydropower generation Peaking
Type of permit FERC License

FERC information

FERC docket # P-201
FERC project name Blind Slough
Permit issued 8/22/03
Permit expiration 11/8/34

Ownership and operation

Owner City of Petersburg
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1954
Transmission or distribution system owner Petersburg Borough - (AK)

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 1.6 MW
Average annual net hydropower generation 11,317.6 MWH

Is there something you’d like to add or correct? Please let us know.