AK
Blind Slough P-201
General information | |
Waterway | Blind River, Crystal Creek |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-201 |
Permit issued | 8/22/2003 |
Permit expires | 11/8/2034 |
Ownership and operation | |
Owner | City of Petersburg |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 1954 |
Transmission or distribution system owner | Petersburg Borough - (AK) |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 1.6 mW |
Average annual net hydropower generation | 11,317.6 mWH |
News and updates
From American Whitewater1/21/2021
From American Whitewater1/19/2021