MA

Boott Hydropower P-2790

General information

Waterway  Eastern Canal
Current status  Active 
Type of facility Conventional Hydro
Type of permit FERC License

FERC information

FERC docket # P-2790
Permit issued 4/8/1983
Permit expires 4/26/2023

Ownership and operation

Owner Boott Hydropower Inc
Owner type Private Non-utility
Year first online (conventional hydro) 1985
Transmission or distribution system owner Massachusetts Electric Co

Power and generating capacity

Number of units 3
Total capacity from hydraulic turbine-generator units within each plant 22.9 mW
Average annual net hydropower generation 86,298.5 mWH

From our Resource Library

License summaries, Northwest

Henry Jackson, Sultan River, Washington

See all resources