UT
Boulder Creek P-2219
General information | |
Waterway | West Fork Boulder Creek |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Run-of-river |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2219 |
Permit issued | 8/26/2007 |
Permit expires | 6/26/2040 |
Ownership and operation | |
Owner | Garkane Energy Coop, Inc |
Owner type | Cooperative |
Year first online (conventional hydro) | 1958 |
Transmission or distribution system owner | Garkane Energy Coop, Inc |
Power and generating capacity | |
Number of units | 3 |
Total capacity from hydraulic turbine-generator units within each plant | 4.2 mW |
Average annual net hydropower generation | 23,576.5 mWH |
This 4.3 MW project is located in south-central Utah, in Garfield County. This project operates in run-of-river mode. Depending upon the availability of water, all or a portion of the combined flows of the East Fork and West Fork of Boulder Creek is diverted into the penstock.
Milestones
License Issued | 08-31-2007 |
[wpv-view name=”related-resources”]
[wpv-view name=”related-news”]