Boulder Creek P-2219
General information | |
| Waterway |
West Fork Boulder Creek |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Run-of-river |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-2219 |
| FERC project name | Boulder Creek |
| Permit issued | 8/26/07 |
| Permit expiration | 6/26/40 |
Ownership and operation | |
| Owner | Garkane Energy Coop, Inc |
| Owner type | Cooperative |
| Year first online (conventional hydro) | 1958 |
| Transmission or distribution system owner | Garkane Energy Coop, Inc |
Power and generating capacity | |
| Number of units | 3 |
| Total capacity from hydraulic turbine-generator units within each plant | 4.2 MW |
| Average annual net hydropower generation | 23,576.5 MWH |
This 4.3 MW project is located in south-central Utah, in Garfield County. This project operates in run-of-river mode. Depending upon the availability of water, all or a portion of the combined flows of the East Fork and West Fork of Boulder Creek is diverted into the penstock.
Milestones
| License Issued | 08-31-2007 |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Sportfishing Protection Alliance11/1/2025
Measuring Flow to Support New Interim Flow Requirements in the Shasta River
From California Sportfishing Protection Alliance11/1/2025