MD
Brighton P-3633
General information | |
| Waterway |
Patuxent River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Peaking |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-3633 |
| FERC project name | Brighton |
| Permit issued | 9/16/84 |
| Permit expiration | 8/27/24 |
Ownership and operation | |
| Owner | KC Brighton LLC |
| Owner type | Private Non-utility |
| Year first online (conventional hydro) | 1986 |
Power and generating capacity | |
| Number of units | 2 |
| Total capacity from hydraulic turbine-generator units within each plant | 0.4 MW |
| Average annual net hydropower generation | 2,100.0 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Sportfishing Protection Alliance11/1/2025
Measuring Flow to Support New Interim Flow Requirements in the Shasta River
From California Sportfishing Protection Alliance11/1/2025

