WY
Buffalo Bill
General information | |
Waterway |
Shoshone River |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | Reclamation |
Ownership and operation | |
Owner | Reclamation Great Plains Region (GP) |
Owner type | Reclamation |
Year first online (conventional hydro) | 1992 |
Transmission or distribution system owner | WAPA-- Western Area Power Administration |
Power and generating capacity | |
Number of units | 3 |
Total capacity from hydraulic turbine-generator units within each plant | 18.0 MW |
Average annual net hydropower generation | 67,413.8 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League9/5/2023
The Possible Impacts of the EPA Redefining “Waters of the United States” on the Yuba Watershed
From Idaho Rivers United9/1/2023