AR
Bull Shoals
General information | |
Waterway |
Bull Shoals Lake |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | US Army Corps of Engineers |
Ownership and operation | |
Owner | USCE-Little Rock District |
Owner type | USACE |
Year first online (conventional hydro) | 1952 |
Transmission or distribution system owner | Southwestern Power Administration |
Power and generating capacity | |
Number of units | 8 |
Total capacity from hydraulic turbine-generator units within each plant | 340.0 mW |
Average annual net hydropower generation | 749,217.3 mWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From American Whitewater5/31/2023
From South Yuba River Citizens League5/31/2023
The Supreme Court’s Decision on Sackett and What That Means for the Yuba Watershed