WA
Chief Joseph
General information | |
Waterway |
Columbia River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Type of permit | US Army Corps of Engineers |
Ownership and operation | |
Owner | USCE-North Pacific Division |
Owner type | USACE |
Year first online (conventional hydro) | 1955 |
Transmission or distribution system owner | Bonneville Power Administration |
Power and generating capacity | |
Number of units | 27 |
Total capacity from hydraulic turbine-generator units within each plant | 2,456.2 MW |
Average annual net hydropower generation | 11,239,183.7 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition