MO
Clarence Cannon
General information | |
Waterway |
Mark Twain Lake |
Current status | Active  |
Type of facility | Conventional Hydro, Pumped Storage |
Type of permit | US Army Corps of Engineers |
Ownership and operation | |
Owner | USCE-St Louis District |
Owner type | USACE |
Year first online (conventional hydro) | 1984 |
Year first online (pumped storage) | 1984 |
Transmission or distribution system owner | Northeast Missouri El Pwr Coop |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 27.0 mW |
Average annual net hydropower generation | 38,067.0 mWH |
Total capacity from pumped storage turbine-generator units | 31.0 mW |
Pumped storage gross generation in megawatt hours for each powerplant | 66,982.4 mWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From Trout Unlimited3/23/2023
NOAA biological opinion unrealistic for Kennebec River recovery
From South Yuba River Citizens League3/20/2023
SYRCL’s 40th Anniversary Film YUBA IS THE HEART is now available to view.