NE

Columbus P-1256

General information

Waterway  Loup & Canal
Current status  Active 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-1256
Permit issued 5/17/2017
Permit expires 4/26/2047

Ownership and operation

Owner Loup River Public Power Dist
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1936
Transmission or distribution system owner Nebraska Public Power District

Power and generating capacity

Number of units 3
Total capacity from hydraulic turbine-generator units within each plant 45.6 mW
Average annual net hydropower generation 124,393.8 mWH

Milestones

Study Plan Determination Issued 08-26-2009

 

From our Resource Library

License summaries, Southeast

W Kerr Scott, Yadkin River, South Carolina

See all resources