Conduit 3 P-14498
General information | |
| Waterway |
Conduit 3 Pipeline |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Canal/Conduit |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-14498 |
| FERC project name | Conduit 3 |
| Permit issued | 5/29/13 |
Ownership and operation | |
| Owner | City of Portland Water Bureau |
| Owner type | Publicly Owned Utility |
| Year first online (conventional hydro) | 2015 |
Power and generating capacity | |
| Number of units | 4 |
| Total capacity from hydraulic turbine-generator units within each plant | 0.2 MW |
| Average annual net hydropower generation | 1,200.0 MWH |