Cowiche P-7337
General information | |
Waterway |
Tieton River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Canal/Conduit |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-7337 |
FERC project name | Cowiche |
Permit issued | 7/1/84 |
Permit expiration | 6/26/34 |
Ownership and operation | |
Owner | Yakima-Tieton Irrigation District |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 1987 |
Transmission or distribution system owner | PacifiCorp |
Power and generating capacity | |
Number of units | 1 |
Total capacity from hydraulic turbine-generator units within each plant | 1.7 MW |
Average annual net hydropower generation | 3,295.8 MWH |
Is there something you’d like to add or correct? Please let us know.
Related resources
News and updates
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition
From American Rivers9/9/2024