NH
Cross Power P-2326
General information | |
| Waterway |
Androscoggin River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Run-of-river |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-2326 |
| FERC project name | Cross Power |
| Permit issued | 7/27/94 |
| Permit expiration | 7/27/24 |
Ownership and operation | |
| Owner | Great Lakes Hydro America LLC |
| Owner type | Wholesale Power Marketer |
| Year first online (conventional hydro) | 1914 |
| Transmission or distribution system owner | Public Service Co of NH |
Power and generating capacity | |
| Number of units | 5 |
| Total capacity from hydraulic turbine-generator units within each plant | 3.0 MW |
| Average annual net hydropower generation | 13,670.5 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025

