Cushman 1 P-460
General information | |
Waterway |
North Fork Skokomish River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-460 |
FERC project name | Cushman |
Other projects with this FERC number | |
Permit issued | 7/25/98 |
Permit expiration | 6/26/58 |
Ownership and operation | |
Owner | Tacoma City of |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 1926 |
Transmission or distribution system owner | City of Tacoma - (WA) |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 43.2 MW |
Average annual net hydropower generation | 130,241.9 MWH |
The Cushman Hydroelectric Project is located on the North Fork of the Skokomish River in Mason County, Washington, and occupies U.S. lands within the Olympic National Forest and the Skokomish Indian Reservation.
Read Mary Pavel’s testimony to the House Energy and Commerce Committee in May 2022, telling the story of the Cushman project.
The project consists of two dams and impoundments on the North Fork of the Skokomish River with associated power tunnels and penstocks, powerhouses, and a 26.8- mile-long primary transmission system.
The Dam No. 1 development consists of a 260-foot-high concrete arch dam that impounds Lake Cushman, a 9.6-mile-long storage reservoir with a 4,058-acre surface area and a 453,350 acre-foot storage capacity at full pool.
The Dam No. 2 development consists of a 230-foot-high concrete arch dam approximately 2 miles downstream of Dam No. 1, which impounds Lake Kokanee, a 128-acre lake with a gross storage capacity of 7,300 acre-feet at full pool.
In January 2009, the City proposed to build a powerhouse which would contain two Francis turbine/generator units- 1.8MW each (for an additional 3.6MW). FERC approved the construction and the settlement and issued a renewed license for until 2048.
Is there something you’d like to add or correct? Please let us know.
News and updates
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition