TN
Dale Hollow
General information | |
Waterway |
Obey River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Type of permit | US Army Corps of Engineers |
Ownership and operation | |
Owner | USCE-Nashville District |
Owner type | USACE |
Year first online (conventional hydro) | 1948 |
Transmission or distribution system owner | Tennessee Valley Authority |
Power and generating capacity | |
Number of units | 3 |
Total capacity from hydraulic turbine-generator units within each plant | 54.0 MW |
Average annual net hydropower generation | 119,924.1 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From Alabama Rivers Alliance2/21/2025
ARA and SELC submit comments for the R.L. Harris Dam relicensing on the Tallapoosa River
From Idaho Rivers United1/14/2025
Federal agencies prepare a SEIS to update the Columbia River System Operations