WI
De Pere P-4914
General information | |
Waterway |
Fox River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Run-of-river |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-4914 |
FERC project name | De Pere |
Permit issued | 3/5/05 |
Permit expiration | 2/24/35 |
Ownership and operation | |
Owner | International Paper Co |
Owner type | Industrial |
Year first online (conventional hydro) | 1992 |
Power and generating capacity | |
Number of units | 8 |
Total capacity from hydraulic turbine-generator units within each plant | 1.3 MW |
Average annual net hydropower generation | 4,691.0 MWH |
The project is located at the U.S. Army Corps of Engineers’ De Pere Dam, on the Fox River, in the City of De Pere, Brown County, Wisconsin.
Is there something you’d like to add or correct? Please let us know.
News and updates
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition