WI
De Pere P-4914
General information | |
Waterway |
Fox River |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Run-of-river |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-4914 |
FERC project name | De Pere |
Permit issued | 3/5/05 |
Permit expiration | 2/24/35 |
Ownership and operation | |
Owner | International Paper Co |
Owner type | Industrial |
Year first online (conventional hydro) | 1992 |
Power and generating capacity | |
Number of units | 8 |
Total capacity from hydraulic turbine-generator units within each plant | 1.3 mW |
Average annual net hydropower generation | 4,691.0 mWH |
The project is located at the U.S. Army Corps of Engineers’ De Pere Dam, on the Fox River, in the City of De Pere, Brown County, Wisconsin.
Is there something you’d like to add or correct? Please let us know.
Newsandupdates
From Alabama Rivers Alliance1/26/2023
From California Trout1/24/2023
Introducing CalTrout’s Lost Coast Project Manager & Update on Eel River Dams