Deer Island Treatment Plant P-11412
General information | |
Waterway |
Boston Harbor |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Canal/Conduit |
Type of permit | FERC Exemption |
FERC information | |
FERC docket # | P-11412 |
FERC project name | Deer Island |
Permit issued | 11/4/93 |
Ownership and operation | |
Owner | Massachusetts Wtr RAuth-Deer I |
Owner type | State |
Year first online (conventional hydro) | 2001 |
Transmission or distribution system owner | NSTAR Electric Company |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 2.0 MW |
Average annual net hydropower generation | 5,847.2 MWH |