ME
Deer Rips P-2283
General information | |
| Waterway |
Androscoggin River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Peaking |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-2283 |
| FERC project name | Gulf Island - Deer Rips |
| Other projects with this FERC number | |
| Permit issued | 1/14/07 |
| Permit expiration | 12/27/48 |
Ownership and operation | |
| Owner | Brookfield White Pine Hydro, LLC. |
| Owner type | Wholesale Power Marketer |
| Year first online (conventional hydro) | 1903 |
| Transmission or distribution system owner | Central Maine Power Co |
Power and generating capacity | |
| Number of units | 7 |
| Total capacity from hydraulic turbine-generator units within each plant | 6.5 MW |
| Average annual net hydropower generation | 27,404.8 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Trout1/21/2026
From South Yuba River Citizens League1/21/2026
The PERMIT Act Passed the House: What It Means for the Yuba River Watershed

