DeWitt Pipeline Hydroelectric Project P-13820
General information | |
| Waterway |
Water Distribution Center |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Canal/Conduit |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-13820 |
| FERC project name | Dewitt Pipeline |
| Permit issued | 1/6/11 |
Ownership and operation | |
| Owner | Logan City, Utah |
| Owner type | Publicly Owned Utility |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 0.2 MW |
| Average annual net hydropower generation | 930.0 MWH |