ID
Dietrich Drop P-8909
General information | |
Waterway |
Milner-Gooding Canal |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Canal/Conduit |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-8909 |
FERC project name | Dietrich Drop |
Permit issued | 5/17/87 |
Permit expiration | 4/26/37 |
Ownership and operation | |
Owner | CHI-IDAHO INC.(ID) |
Owner type | Private Non-utility |
Year first online (conventional hydro) | 1990 |
Transmission or distribution system owner | Idaho Power Co |
Power and generating capacity | |
Number of units | 1 |
Total capacity from hydraulic turbine-generator units within each plant | 4.8 mW |
Average annual net hydropower generation | 13,192.1 mWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From Alabama Rivers Alliance1/26/2023
From California Trout1/24/2023
Introducing CalTrout’s Lost Coast Project Manager & Update on Eel River Dams