OR
Dorena Lake Dam Project P-11945
General information | |
Waterway |
Dorena Lake |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-11945 |
FERC project name | Dorena Lake Dam |
Permit issued | 10/12/08 |
Permit expiration | 9/26/58 |
Ownership and operation | |
Owner | Dorena Hydro, LLC. |
Owner type | Private Non-utility |
Year first online (conventional hydro) | 2014 |
Transmission or distribution system owner | PacifiCorp |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 7.5 MW |
Average annual net hydropower generation | 8,836.4 MWH |
This is a 8.3 MW project proposed by Symbiotics, LLC near the city of Cottage Grove, in Lane County, Oregon.
The project would use the existing reservoir, Dorena Lake, and Dorena Lake Dam, owned and operated by the Army Corps.
Milestones
License Issued | 11-28-2008 |
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition
From American Rivers9/9/2024