OR

Dorena Lake Dam Project P-11945

General information

Waterway  Dorena Lake
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Peaking
Type of permit FERC License

FERC information

FERC docket # P-11945
FERC project name Dorena Lake Dam
Permit issued 10/12/08
Permit expiration 9/26/58

Ownership and operation

Owner Dorena Hydro, LLC.
Owner type Private Non-utility
Year first online (conventional hydro) 2014
Transmission or distribution system owner PacifiCorp

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 7.5 MW
Average annual net hydropower generation 8,836.4 MWH

This is a 8.3 MW project proposed by Symbiotics, LLC near the city of Cottage Grove, in Lane County, Oregon.

The project would use the existing reservoir, Dorena Lake, and Dorena Lake Dam, owned and operated by the Army Corps.

 

Milestones

License Issued 11-28-2008

Is there something you’d like to add or correct? Please let us know.