CA
Drop 3
General information | |
Waterway |
Well & Canal Filtered |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Canal/Conduit |
Type of permit | Other |
Ownership and operation | |
Owner | Imperial Irrigation District |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 1941 |
Transmission or distribution system owner | Imperial Irrigation District |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 9.2 MW |
Average annual net hydropower generation | 46,800.3 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition