CA

East Portal Generator P-6868

General information

Waterway  Water Pipeline
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Exemption

FERC information

FERC docket # P-6868
FERC project name East Portal of Santa Susana Tunnel
Permit issued 4/6/83

Ownership and operation

Owner Calleguas Mun Water District
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1987
Transmission or distribution system owner Southern California Edison Co

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 1.2 MW
Average annual net hydropower generation 5,546.6 MWH

Is there something you’d like to add or correct? Please let us know.