Eklutna Hydro Project
General information | |
| Waterway |
Eklutna Lake |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Type of permit | Unknown |
Ownership and operation | |
| Owner | Anchorage Municipal Light and Power |
| Owner type | Publicly Owned Utility |
| Year first online (conventional hydro) | 1955 |
| Transmission or distribution system owner | Chugach Electric Assn Inc |
Power and generating capacity | |
| Number of units | 2 |
| Total capacity from hydraulic turbine-generator units within each plant | 44.4 MW |
| Average annual net hydropower generation | 101,824.8 MWH |
Is there something you’d like to add or correct? Please let us know.
Related resources
Related posts
- From Trout Unlimited 02/05/24
Free the Eklutna River - From Trout Unlimited 12/21/21
Surveying what’s left of Eklutna River’s Salmon - From Trout Unlimited 03/19/21
Breaking: Alaska Federation of Natives endorses restoration of the Eklutna River - From Trout Unlimited 12/17/20
Return to Us: A good story, well told
News and updates
From California Sportfishing Protection Alliance11/1/2025
Measuring Flow to Support New Interim Flow Requirements in the Shasta River
From California Sportfishing Protection Alliance11/1/2025