CA

El Dorado P-184

General information

Waterway  North Fork Long Canyon Tributary
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Peaking
Type of permit FERC License

FERC information

FERC docket # P-184
FERC project name El Dorado
Permit issued 10/13/06
Permit expiration 9/26/46

Ownership and operation

Owner El Dorado Irrigation District
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1924
Transmission or distribution system owner Pacific Gas & Electric Co

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 20.0 MW
Average annual net hydropower generation 63,103.1 MWH

Is there something you’d like to add or correct? Please let us know.

News and updates

From California Sportfishing Protection Alliance11/24/2024

FERC Holds PG&E Accountable for 2023 Butte Canal Failure

See all news and updates