CA

Etiwanda P-11441

General information

Waterway  River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Exemption

FERC information

FERC docket # P-11441
FERC project name Etiwanda
Permit issued 5/15/94

Ownership and operation

Owner Metropolitan Water District of S CA
Owner type State
Year first online (conventional hydro) 1994
Transmission or distribution system owner Southern California Edison Co

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 23.9 MW
Average annual net hydropower generation 60,842.3 MWH

Is there something you’d like to add or correct? Please let us know.