Etiwanda P-11441
General information | |
Waterway |
River |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Canal/Conduit |
Type of permit | FERC Exemption |
FERC information | |
FERC docket # | P-11441 |
FERC project name | Etiwanda |
Permit issued | 5/15/94 |
Ownership and operation | |
Owner | Metropolitan Water District of S CA |
Owner type | State |
Year first online (conventional hydro) | 1994 |
Transmission or distribution system owner | Southern California Edison Co |
Power and generating capacity | |
Number of units | 1 |
Total capacity from hydraulic turbine-generator units within each plant | 23.9 mW |
Average annual net hydropower generation | 60,842.3 mWH |