CA
Etiwanda P-11441
General information | |
| Waterway |
River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Canal/Conduit |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-11441 |
| FERC project name | Etiwanda |
| Permit issued | 5/15/94 |
Ownership and operation | |
| Owner | Metropolitan Water District of S CA |
| Owner type | State |
| Year first online (conventional hydro) | 1994 |
| Transmission or distribution system owner | Southern California Edison Co |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 23.9 MW |
| Average annual net hydropower generation | 60,842.3 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025

