ID
Falls River Hydro P-9885
General information | |
| Waterway |
Falls River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-9885 |
| FERC project name | Falls River |
| Permit issued | 5/20/89 |
| Permit expiration | 4/26/29 |
Ownership and operation | |
| Owner | Marysville Hydro Partners |
| Owner type | Private Non-utility |
| Year first online (conventional hydro) | 1993 |
| Transmission or distribution system owner | Fall River Rural Elec Coop Inc |
Power and generating capacity | |
| Number of units | 2 |
| Total capacity from hydraulic turbine-generator units within each plant | 9.0 MW |
| Average annual net hydropower generation | 48,455.2 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025

