OR
Farmers ID No. 2 P-7532
General information | |
Waterway |
Farmers Ditch From Hood River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Run-of-river |
Type of permit | FERC Exemption |
FERC information | |
FERC docket # | P-7532 |
FERC project name | Farmers Irrigation District No 2 |
Permit issued | 4/1/84 |
Ownership and operation | |
Owner | Farmer's Irrigation District |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 2015 |
Transmission or distribution system owner | PacifiCorp |
Power and generating capacity | |
Number of units | 1 |
Total capacity from hydraulic turbine-generator units within each plant | 2.6 MW |
Average annual net hydropower generation | 14,304.1 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Trout6/6/2025
Six Things to Know about the Potter Valley Project and Eel River Restoration
From California Sportfishing Protection Alliance4/28/2025
PG&E proposes “rapid removal” plan for Cape Horn and Scott dams on the Eel River