ID
Faulkner Hydro Plant P-7592
General information | |
Waterway |
Conduit |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Canal/Conduit |
Type of permit | FERC Exemption |
FERC information | |
FERC docket # | P-7592 |
FERC project name | Faulkner |
Permit issued | 5/31/84 |
Ownership and operation | |
Owner | Faulkner Land & Livestock Co. |
Owner type | Private Non-utility |
Year first online (conventional hydro) | 1987 |
Power and generating capacity | |
Number of units | 1 |
Total capacity from hydraulic turbine-generator units within each plant | 0.9 mW |
Average annual net hydropower generation | 173.3 mWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From American Whitewater5/31/2023
From South Yuba River Citizens League5/31/2023
The Supreme Court’s Decision on Sackett and What That Means for the Yuba Watershed