MA
Fife Brook P-2669
General information | |
Waterway | Deerfield River |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2669 |
FERC project name | Bear Swamp |
Other projects with this FERC number | |
Permit issued | 4/23/1970 |
Permit expires | 3/27/2020 |
Ownership and operation | |
Owner | Brookfield Power New England |
Owner type | Wholesale Power Marketer |
Year first online (conventional hydro) | 1974 |
Transmission or distribution system owner | Public Service Co of NH |
Power and generating capacity | |
Number of units | 1 |
Total capacity from hydraulic turbine-generator units within each plant | 11.2 mW |
Average annual net hydropower generation | 29,114.5 mWH |
News and updates
From Trout Unlimited2/26/2021
From California Trout2/26/2021