CO
Flatiron
General information | |
Waterway |
Colorado River |
Current status | Active license  |
Type of facility | Conventional Hydro, Pumped Storage |
Mode of hydropower generation | Peaking |
Type of permit | Reclamation |
Ownership and operation | |
Owner | Reclamation Great Plains Region (GP) |
Owner type | Reclamation |
Year first online (conventional hydro) | 1954 |
Year first online (pumped storage) | 1954 |
Transmission or distribution system owner | WAPA-- Western Area Power Administration |
Power and generating capacity | |
Number of units | 3 |
Total capacity from hydraulic turbine-generator units within each plant | 86.0 MW |
Average annual net hydropower generation | 187,877.8 MWH |
Total capacity from pumped storage turbine-generator units | 8.5 MW |
Pumped storage gross generation in megawatt hours for each powerplant | 35,286.8 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Sportfishing Protection Alliance11/24/2024
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts