CO

Fort Collins Micro Hydro Project CD14-20

General information

Waterway  Conduit/Canal
Current status  Active 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Qualifying Conduit

FERC information

FERC docket # CD14-20
Permit issued 7/12/2014

Ownership and operation

Owner City of Fort Collins
Owner type Publicly Owned Utility

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 0.1 mW
Average annual net hydropower generation 550.0 mWH

From our Resource Library

License summaries, Northwest

Enloe Project, Similkameen River, Washington

Hydro guides

Media Guide

See all resources