TN
Fort Patrick Henry
General information | |
Waterway |
South Fork Holston River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Run-of-river |
Type of permit | TVA |
Ownership and operation | |
Owner | Tennessee Valley Authority |
Owner type | TVA |
Year first online (conventional hydro) | 1953 |
Transmission or distribution system owner | Tennessee Valley Authority |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 59.4 MW |
Average annual net hydropower generation | 104,651.4 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From Eric Rounds9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition
From Eric Rounds9/9/2024