SD
Fort Randall
General information | |
Waterway |
Missouri River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | US Army Corps of Engineers |
Ownership and operation | |
Owner | USCE-Missouri River District |
Owner type | USACE |
Year first online (conventional hydro) | 1954 |
Transmission or distribution system owner | WAPA-- Western Area Power Administration |
Power and generating capacity | |
Number of units | 8 |
Total capacity from hydraulic turbine-generator units within each plant | 320.0 MW |
Average annual net hydropower generation | 1,457,876.8 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Sportfishing Protection Alliance2/25/2025
State Water Board Takes Action to Protect Klamath River Salmon and Steelhead
From Alabama Rivers Alliance2/21/2025
ARA and SELC submit comments for the R.L. Harris Dam relicensing on the Tallapoosa River