CA
Frankenheimer Power Plant P-3113
General information | |
| Waterway |
South San Joaquin Irrigation District |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Canal/Conduit |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-3113 |
| FERC project name | Frankenheimer |
| Permit issued | 11/5/80 |
Ownership and operation | |
| Owner | Turlock Irrigation District |
| Owner type | Publicly Owned Utility |
| Year first online (conventional hydro) | 1983 |
| Transmission or distribution system owner | Pacific Gas & Electric Co |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 5.3 MW |
| Average annual net hydropower generation | 13,443.0 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025