MI

French Paper Hydro P-10624

General information

Waterway  St Joseph River
Current status  Active 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-10624
Permit issued 2/23/1991
Permit expires 2/24/2021

Ownership and operation

Owner French Paper Company
Owner type Industrial
Year first online (conventional hydro) 1921
Transmission or distribution system owner Indiana Michigan Power Co

Power and generating capacity

Number of units 4
Total capacity from hydraulic turbine-generator units within each plant 1.3 mW
Average annual net hydropower generation 7,642.6 mWH

From our Resource Library

License summaries, Mountain West

Hyrum Project, Blacksmith River, Utah

See all resources