Gavins Point

General information

Waterway  Missouri River
Current status   Active 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit US Army Corps of Engineers

Ownership and operation

Owner USCE-Missouri River District
Owner type USACE
Year first online (conventional hydro) 1956
Transmission or distribution system owner WAPA-- Western Area Power Administration

Power and generating capacity

Number of units 3
Total capacity from hydraulic turbine-generator units within each plant 132.3 mW
Average annual net hydropower generation 648,333.1 mWH