WV
Glen Ferris Hydro P-14439
General information | |
| Waterway |
Kanawha River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Run-of-river |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-14439 |
| FERC project name | Glen Ferris |
| Permit issued | 12/17/17 |
| Permit expiration | 1/27/64 |
Ownership and operation | |
| Owner | Hawks Nest Hydro LLC |
| Owner type | Wholesale Power Marketer |
| Year first online (conventional hydro) | 1912 |
| Transmission or distribution system owner | Appalachian Power Co |
Power and generating capacity | |
| Number of units | 8 |
| Total capacity from hydraulic turbine-generator units within each plant | 6.2 MW |
| Average annual net hydropower generation | 18,953.8 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025

