Golden Gate P-5039

General information

Waterway  Deer Flat Lowline Canal
Current status   Active 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Exemption

FERC information

FERC docket # P-5039
FERC project name Golden Gate
Permit issued 10/18/1981

Ownership and operation

Owner Boise Project Board of Control
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1981

Power and generating capacity

Number of units 4
Total capacity from hydraulic turbine-generator units within each plant 0.7 mW
Average annual net hydropower generation 2,746.2 mWH