ID
Golden Gate P-5039
General information | |
Waterway |
Deer Flat Lowline Canal |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Canal/Conduit |
Type of permit | FERC Exemption |
FERC information | |
FERC docket # | P-5039 |
FERC project name | Golden Gate |
Permit issued | 10/18/81 |
Ownership and operation | |
Owner | Boise Project Board of Control |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 1981 |
Power and generating capacity | |
Number of units | 4 |
Total capacity from hydraulic turbine-generator units within each plant | 0.7 MW |
Average annual net hydropower generation | 2,746.2 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From Eric Rounds9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition
From Eric Rounds9/9/2024