Goodwin Hydroelectric P-4297
General information | |
Waterway |
West Branch Farmington River |
Current status | Active  |
Type of facility | Conventional Hydro |
Type of permit | FERC Exemption |
FERC information | |
FERC docket # | P-4297 |
FERC project name | Goodwin Dam |
Permit issued | 9/25/81 |
Ownership and operation | |
Owner | Metropolitan Dist of Hartford |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 1986 |
Transmission or distribution system owner | Connecticut Light & Power Co |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 3.2 mW |
Average annual net hydropower generation | 14,046.3 mWH |